WeDesign Lab is an international design firm operating in the fields of architecture, interior design, project and construction management. Our current projects are located all over Europe with main focus in Italy, Greece and Romania. We specialise in hospitality design, including interior & exterior design, concept creation, upscale renovations, energy performance consulting as well as building typology researches.
Our high-end projects include both new building construction and renovations of interiors of all sizes, small to large. We are committed to delivering inspired designs that fulfil client expectations through collaboration and exceptional service.
Recognizing the need is the primary condition for design.
Charles Eames
Creative process steps
Step 1
Programming
Step 2
Concept Development
Step 3
Presentation
Step 4
Final Design Development and Documentation
Step 5
Execution
Step 6
Evaluation
Step 1
Programming
The Programming phase can be broken down into four distinct stages:
Design statement
Research
Programme document
Client review and approval
The initial ‘Design Statement’defines the project in very general terms. It identifies the client(s); the nature of the project (primary residence, holiday home, office, etc.); the location of the project; the purpose of the space and the extent of the design work. The research process begins with identification of each of the users – from principal occupants to guests and friends. In a residential design, a profile may be developed for each of the principal residents, including such information as their age and sex, hobbies, habits, need for privacy, style and colour preferences, and an inventory of possessions and furnishings that need to be accommodated in the redesigned space. This stage involves interviews with the client and other end-users, surveys, inventories and wider research. It is important to ascertain the objectives, requirements, feasibility, extent and constraints (regulatory or financial) associated with the project. Space adjacencies, circulation patterns (‘traffic flow’) and spatial and activity relationships may be sketched in the form of ‘bubble diagrams’. The programme data is analysed and the results are compiled in a Programme Document that articulates the design problem and outlines a solution. The programme document is reviewed and approved by the client.
Step 2
Concept Development
Once the design programme is approved, the concept development phase begins. This phase may be broken down into 2 stages:
Ideation stage
Concept Statement with Schematics
Once the Design Programme Document is approved, the concept development phase begins. The initial ‘ideation’ stage involves brainstorming design solutions (verbal, sketched or written) before filtering out unworkable ideas and refining the workable ones until one or more main design concepts emerge. The main design concept is articulated in the form of a written Concept Statement expressing the principal ideas and approach behind the proposed design solution. The Concept Statement is accompanied by Schematic Drawings – quick sketches and graphic visualizations of these main ideas – portraying the siting, orientation, space allocations, circulation patterns, spatial and activity relationships from a variety of perspectives, colour schemes and other important details of the proposed design. Bubble diagrams are refined by the addition of proportion and character.
Step 3
Presentation
One or more design concepts is presented to the client in the form of a proposal, for review, feedback and approval. The proposal may consist of
The Design Concept Statement and supporting conceptual drawings, including scaled floor plans showing furniture placement; mood boards showing colour, materials and finishes.
Depending on the scale of the project, the proposal may include additional sketches, perspective drawings, full colour renderings, 3-D models or computer simulations.
Cost estimates for the project, including materials, labour and a fee for design services. At this stage, project costs can only be estimated as precise costs can only be obtained once final working drawings are submitted to contractors, suppliers and installers for their bids.
Time frame showing events in sequence and a proposed completion date.
Step 4
Final Design Development and Documentation
Final Working Drawings (also called ‘Construction Drawings‘) are produced. These may include perspective drawings, site plans, floor plans, reflected ceiling plans (showing lighting and ceiling fixtures), sections, elevations and detailed drawing of architectural elements (e.g. doors and windows) and design elements (e.g. paint, trim, wall coverings and window treatments), along with all drawing notes necessary for the construction and installation of the design. Written Specifications list and describe in detail all furnishings and materials to be acquired, and Schedules list the type, finishes and placement of architectural and design elements. The final design documentation, including drawings, specifications, schedules and timeframe become part of the WeDesign Lab’s contract with client.
Step 5
Execution
Once the final design is approved, the execution or implementation phase marks the realisation of the design. Contractors’ bids are sought and WeDesign Lab prepares a detailed schedule of works, choreographing construction, installations and finishing in their proper sequence, which may be in the form of a Gantt Chart. All materials, furnishings and accessories are ordered. Delivered goods are inspected and damaged items are repaired, returned or re-ordered, and marked according to project and placement. The team of WeDesign Lab makes regular site visits to co-ordinate progress, inspect the quality of workmanship and resolve any on-site issues. Once construction and installation works are complete, the designer will draw up a ‘Snag List’ (also called a ‘Punch List’) of defects to be resolved before movable furnishings, materials and accessories are installed.
Step 6
Evaluation
The Post-Occupancy Evaluation (POE) is an important final step in the design process. The designer follows up after completion of the project to measure the success of the design solution. This may involve a questionnaire, interview or walk-through inspection with the client. The designer may make adjustments and revisions to improve the result. Evaluation may also be invited from peers. Project evaluation should be repeated at intervals to measure user-satisfaction and to increase professional knowledge for future projects.
Step 1
Programming
The Programming phase can be broken down into four distinct stages:
Design statement
Research
Programme document
Client review and approval
The initial ‘Design Statement’defines the project in very general terms. It identifies the client(s); the nature of the project (primary residence, holiday home, office, etc.); the location of the project; the purpose of the space and the extent of the design work. The research process begins with identification of each of the users – from principal occupants to guests and friends. In a residential design, a profile may be developed for each of the principal residents, including such information as their age and sex, hobbies, habits, need for privacy, style and colour preferences, and an inventory of possessions and furnishings that need to be accommodated in the redesigned space. This stage involves interviews with the client and other end-users, surveys, inventories and wider research. It is important to ascertain the objectives, requirements, feasibility, extent and constraints (regulatory or financial) associated with the project. Space adjacencies, circulation patterns (‘traffic flow’) and spatial and activity relationships may be sketched in the form of ‘bubble diagrams’. The programme data is analysed and the results are compiled in a Programme Document that articulates the design problem and outlines a solution. The programme document is reviewed and approved by the client.
Step 2
Concept Development
Once the design programme is approved, the concept development phase begins. This phase may be broken down into 2 stages:
Ideation stage
Concept Statement with Schematics
Once the Design Programme Document is approved, the concept development phase begins. The initial ‘ideation’ stage involves brainstorming design solutions (verbal, sketched or written) before filtering out unworkable ideas and refining the workable ones until one or more main design concepts emerge. The main design concept is articulated in the form of a written Concept Statement expressing the principal ideas and approach behind the proposed design solution. The Concept Statement is accompanied by Schematic Drawings – quick sketches and graphic visualizations of these main ideas – portraying the siting, orientation, space allocations, circulation patterns, spatial and activity relationships from a variety of perspectives, colour schemes and other important details of the proposed design. Bubble diagrams are refined by the addition of proportion and character.
Step 3
Presentation
One or more design concepts is presented to the client in the form of a proposal, for review, feedback and approval. The proposal may consist of
The Design Concept Statement and supporting conceptual drawings, including scaled floor plans showing furniture placement; mood boards showing colour, materials and finishes.
Depending on the scale of the project, the proposal may include additional sketches, perspective drawings, full colour renderings, 3-D models or computer simulations.
Cost estimates for the project, including materials, labour and a fee for design services. At this stage, project costs can only be estimated as precise costs can only be obtained once final working drawings are submitted to contractors, suppliers and installers for their bids.
Time frame showing events in sequence and a proposed completion date.
Step 4
Final Design Development and Documentation
Final Working Drawings (also called ‘Construction Drawings‘) are produced. These may include perspective drawings, site plans, floor plans, reflected ceiling plans (showing lighting and ceiling fixtures), sections, elevations and detailed drawing of architectural elements (e.g. doors and windows) and design elements (e.g. paint, trim, wall coverings and window treatments), along with all drawing notes necessary for the construction and installation of the design. Written Specifications list and describe in detail all furnishings and materials to be acquired, and Schedules list the type, finishes and placement of architectural and design elements. The final design documentation, including drawings, specifications, schedules and timeframe become part of the WeDesign Lab’s contract with client.
Step 5
Execution
Once the final design is approved, the execution or implementation phase marks the realisation of the design. Contractors’ bids are sought and WeDesign Lab prepares a detailed schedule of works, choreographing construction, installations and finishing in their proper sequence, which may be in the form of a Gantt Chart. All materials, furnishings and accessories are ordered. Delivered goods are inspected and damaged items are repaired, returned or re-ordered, and marked according to project and placement. The team of WeDesign Lab makes regular site visits to co-ordinate progress, inspect the quality of workmanship and resolve any on-site issues. Once construction and installation works are complete, the designer will draw up a ‘Snag List’ (also called a ‘Punch List’) of defects to be resolved before movable furnishings, materials and accessories are installed.
Step 6
Evaluation
The Post-Occupancy Evaluation (POE) is an important final step in the design process. The designer follows up after completion of the project to measure the success of the design solution. This may involve a questionnaire, interview or walk-through inspection with the client. The designer may make adjustments and revisions to improve the result. Evaluation may also be invited from peers. Project evaluation should be repeated at intervals to measure user-satisfaction and to increase professional knowledge for future projects.